Systems, also provided additional on-site classroom training to their personnel on these cabling systems.
HEWLETT PACKARD CORPORATION
Roseville, California Project Coordinator: Mark Wechsler
Cleveland, Ohio Project Coordinator: Mark Pinski
Minneapolis, Minnesota Project Coordinator: Walt Silbaugh
Cincinnati, Ohio Project Coordinator: Michael Englebrecht
San Jose, California Project Coordinator: John Hernandez
Naperville, Illinois Project Coordinator: Chuck Hatton
Senior Consultant for premises wiring schemes which involved the Planning, Engineering, Design, Specification Writing, Turnkey Installations of Baseband Ethernet, Starlan, Fiber Optic and RF Broadband LAN systems, IBM Cabling Systems and AT&T Premise Distribution Systems. This work included wiring closets, CPU rooms, PBX rooms, conduit, underground and aerial cabling system(s) for Hewlett Packard Customer such as Universities Campuses, Manufacturing Facilities and Commercial Office Space Environments nationwide, with additional involvement in providing on-site training to local representatives of Hewlett-Packard, also involved in the designed Hewlett Packard training center outside of San Jose, CA.
HONDA OF AMERICA MFG. INC.
Columbus, Ohio
Project Coordinators: Glenn Barr Greg Fuches Steve Gilkerson
Senior Project Consultant for Planning, Design, Engineering Specifications of site wide High Speed Data, Video, Voice and Token Ring Network Cabling System(s) for their multiply facility sites in Central United States. This system involved Mechanical Raceways Systems, Crossconnect Closet Locations / Construction, Fiber Optic, IBM Cabling, and Twisted Pairs Cabling, Interface Equipment and End User Equipment. With additional involvement in design and implementation of electronic surveillance of the remote wiring closets. It was the largest Token Ring manufacturing implementation at it's time.
HOSPITAL OF THE UNIVERSITY OF PENNSYLVANIA
Philadelphia, PA
Project Coordinator: Bill Blakeman
Senior Project Consultant for the Installation, Certification and Maintenance of the campus wide RF Broadband Cabling System.
IBM CORPORATION
Austin, Texas
Project Coordinators: Lou Rose Kurt Sarlles
Senior Project Engineering for a site wide design and installation of a RF Broadband Cabling System, IBM Cabling System, and other related Telecommunication Systems. These systems where installed in a multi-building campus covering a radius of 3 - 4 miles and over 10,000 outlet capacity.
IBM CORPORATION
Endicott, New York
Project Coordinator: Dave Robertson
Senior Project Designer and Installation Manager of facility's site wide pilot project RF Broadband LAN supporting IBM's PC Network, 802.4 MAP, and other types of LAN applications.
IBM CORPORATION
Clearwater, Texas
Project Coordinator: Ron Cibulski
Senior Project Engineer for the design and installation of a facility wide RF Broadband Cabling System, IBM Cabling System (voice and data) and a Fiber Optic Cabling System. This project involved on-going support and equipment installations, also provide additional on-site classroom training to IBM personnel on these cabling systems.
IBM CORPORATION
Owego, New York
Project Coordinator: David Coffelt
Senior Project Engineer for the Planning, Design and Installation Specifications for a site wide backbone communication system involving voice, data and video which implemented the IBM Cabling System, a Fiber Optic Cabling System and a RF Broadband Cabling System, also provide classroom training on RF Broadband and Fiber Optic Cabling Systems.
IBM CORPORATION
REAL ESTATE & CONSTRUCTION DIVISION
Project Coordinator: Phil Pearce
Has reference and used D. A. Kelley and his Associates as a specialist and preferred Designer of the IBM Cabling System other IBM customers.
IBM CORPORATION
Research Triangle Park, NC
Project Coordinator: Dale Whitfield
Senior Project Engineer for Planning, Design, Installation of site wide campus